Search Submissions About
Malaysia Bisnes

For people who run companies in Malaysia.

MoneyCost Sheet

Paying for a RM1 million machine: the grant is shut, so here are the loans

MIDA’s Smart Automation Grant ran out of funds twice. What is left is a 4% bank facility, a very small 3% pot and a tax allowance that can outweigh the interest.

MIDA’s Smart Automation Grant has closed twice at fund capacity, and we found no notice of a new round, so budget a RM1 million machine as debt. The cheapest price we can see open across sectors is up to 4% from Bank Negara Malaysia’s (BNM) automation facility, about RM10,125 a month over ten years, per BNM’s factsheet and our calculation.

What is on offer for an automation machine
Scheme and owner What it gives Limit and price Status, as its owner states it
SAG under PENJANA, Malaysian Investment Development Authority (MIDA) Grant, 50% match RM1m a company Closed 1 June 2021, fund capacity
SAG MADANI, MIDA Grant, 70:30 match RM1m a company. RM3,000 fee Closed 15 December 2023, “on hold temporarily”
DIAF, ESG Adoption, MIDA Grant, 50:50 match RM500,000. Bars automation machines Open to 30 November 2026
Automation CA, MIDA and tax return Tax allowance, 200% First RM10m of spending Applications to 31 December 2027
ADF, BNM through banks Loan, 80% guarantee RM3m, up to 4%, up to 10 years “Until full utilisation”. No balance published
SAFP, MIDF Loan RM5m, up to 3%, RM10m pot In Budget 2027 annex. No application page found
Technology Adoption Fund, BPMB group Loan RM10m, up to 15 years, lender’s rate less 1% for 3 years In Budget 2027 annex. Rate not printed
GGSM4, SJPP Guarantee, 70% or 80% RM20m, up to 7 years, capped at BLR or BFR + 2% To 30 June 2027 or full use
Show all 8Show fewer
Illustration of a single industrial robot arm, standing for an automation machine a firm must finance
Illustration: Malaysia Bisnes

Rates come from the owners’ pages listed under where each figure comes from, and they can change.

Is any grant still open for the machine itself?

We found no MIDA grant open for buying an automation machine: its automation funds stopped taking applications and the one grant it still lists bars machines. MIDA’s closure notice of 19 December 2023, which its site no longer shows (our note), said SAG MADANI “has reached its fund capacity and is put on hold temporarily”, with registration closed from 12.01 am on 15 December 2023.

“Temporarily” has now lasted almost three years (the notices). The record:

  • SAG under PENJANA. The e-SAG portal says it reached fund capacity and closed on 1 June 2021, seven months before the 31 December 2021 end date in MIDA’s release of December 2020.
  • SAG MADANI. The guideline set a window of 10 November to 31 December 2023. It shut after 35 days, 16 days early, our count.
  • Industry4WRD Intervention Fund. A RM500,000 grant for firms with a readiness assessment. Its guideline says it reached “its funding capacity for the year 2023” and stopped taking applications on 15 September 2023. We found no notice reopening it.
  • DIAF, ESG Adoption. The only entry on MIDA’s Grants page when we checked. It pays for ESG certification, reporting and training, and its guideline of 19 October 2026 lists “Rental/purchase of automation machine” among costs it will not cover.

SAG MADANI’s guideline refused any spending made before MIDA’s acknowledgement letter, so a machine bought while you wait cannot be claimed later. It also barred second-hand machines and charged a non-refundable RM3,000 fee (paragraphs 3.2, 5.3 and 6.2).

What does RM1 million cost on each route?

On a RM1 million machine the monthly payment runs from about RM10,125 to about RM18,417 on the same BNM facility, because the length of the loan moves the bill far more than the rate does (our working).

One machine, financed in full
Route and terms Monthly payment Total interest
ADF, 4%, 10 years RM10,125 RM214,942
GGSM4 ceiling, 8.40%, 7 years RM15,786 RM326,045
SAFP, 3%, 5 years RM17,969 RM78,121
ADF, 4%, 5 years RM18,417 RM104,991

The sums are ours, by standard amortisation on RM1,000,000 with monthly repayments and no other fees (workings). The 8.40% is Maybank’s 6.40% base lending rate, in force from 11 July 2025 per The Star, plus the 2% that the GGSM4 terms allow. It is not a quote.

Monthly payment on a RM1 million machine, by route
RM a month. Full price financed, no other fees. The 8.40% is a ceiling, not a quote
Monthly payment on a RM1 million machine, by routeOn a RM1 million machine, the ADF at 4% over 10 years costs about RM10,125 a month, the GGSM4 ceiling of 8.40% over 7 years about RM15,786, SAFP at 3% over 5 years about RM17,969, and the ADF at 4% over 5 years about RM18,417. The ten-year loan is the lightest monthly payment despite not being the lowest rate.ADF, 4%, 10 yearsADF, 4%, 10 years: RM10,125RM10,125GGSM4 ceiling, 8.40%, 7yearsGGSM4 ceiling, 8.40%, 7 years: RM15,786RM15,786SAFP, 3%, 5 yearsSAFP, 3%, 5 years: RM17,969RM17,969ADF, 4%, 5 yearsADF, 4%, 5 years: RM18,417RM18,417
Monthly payment on a RM1 million machine, by routeOn a RM1 million machine, the ADF at 4% over 10 years costs about RM10,125 a month, the GGSM4 ceiling of 8.40% over 7 years about RM15,786, SAFP at 3% over 5 years about RM17,969, and the ADF at 4% over 5 years about RM18,417. The ten-year loan is the lightest monthly payment despite not being the lowest rate.ADF, 4%, 10 yearsADF, 4%, 10 years: RM10,125RM10,125GGSM4 ceiling,8.40%, 7 yearsGGSM4 ceiling, 8.40%, 7 years: RM15,786RM15,786SAFP, 3%, 5 yearsSAFP, 3%, 5 years: RM17,969RM17,969ADF, 4%, 5 yearsADF, 4%, 5 years: RM18,417RM18,417
Chart data
RouteMonthly payment, RM
ADF, 4%, 10 yearsRM10,125
GGSM4 ceiling, 8.40%, 7 yearsRM15,786
SAFP, 3%, 5 yearsRM17,969
ADF, 4%, 5 yearsRM18,417
Source: Terms from Bank Negara Malaysia, SJPP and the Budget 2027 annex; Maybank BLR via The Star, 9 July 2025; amortisation is our calculation.

What those rows say:

  • Tenure beats rate. Over five years, the point between 3% and 4% is worth RM448 a month. Stretching the ADF from five years to ten cuts RM8,292 a month and adds RM109,950 of interest, our calculation.
  • The 3% is scarce. The Budget 2027 annex gives the Smart Automation Financing Programme (SAFP) at Malaysian Industrial Development Finance (MIDF) RM10 million for manufacturers and manufacturing-related services. That is ten of these machines at most, our division. The annex prints a five-year subsidy period and no loan tenure, so our five years is assumed.
  • The guarantee has its own bill. Syarikat Jaminan Pembiayaan Perniagaan (SJPP) charges 0.75% a year upfront in focus sectors such as manufacturing, with 80% cover, and 1.0% in other sectors, with 70%. On RM800,000 and RM700,000 of cover over seven years, that is RM42,000 and RM49,000, our calculation, if the fee falls on the full guaranteed sum. The page does not state the base.
  • The ADF’s price includes its guarantee. BNM caps the rate at 4% including any guarantee fee, and its FAQ says no collateral is required.

BNM’s factsheet does not say how much of the price a bank will finance, and a deposit cuts every row. Neither BNM nor SJPP publishes an approval time, and each loan still depends on the lender’s credit assessment.

What did the closed grant take off this bill?

Had SAG MADANI still been open, this purchase could have drawn up to RM700,000 of grant, on our reading, cutting the ADF payment from about RM10,125 to about RM3,037 a month. That gap of RM7,087 a month, our calculation on the remaining RM300,000 (workings), is what an owner is still hoping for.

MIDA’s guideline says “matching basis (70:30)” with a RM1,000,000 cap and never says which side the 70 sits on. We take the 70 as MIDA’s because its Industry4WRD guideline of the same year uses that ratio and refers to “the 70% matching grant” (guideline); the opposite reading gives RM300,000.

The minister told the Dewan Rakyat that the Smart Automation Grant had reached about 120 companies, with nearly RM100 million disbursed, The Star reported in November 2025, without separating the rounds.

Which open measure is worth the most?

For a profitable firm the most valuable open measure is a tax allowance and not a loan, because at a 24% tax rate it shelters RM240,000 more on this machine than ordinary allowances would. MIDA’s Automation Capital Allowance guideline gives 200% on the first RM10 million of spending in the years of assessment 2023 to 2027, for applications it receives by 31 December 2027.

The working, our calculation:

  • Ordinary allowances of 20% initial and 14% annual, per PwC, deduct the RM1,000,000 once.
  • The Automation CA deducts RM2,000,000, so RM1,000,000 more.
  • At 24%, PwC’s standard company rate, that extra deduction is worth RM240,000.
  • At 16%, the rate Budget 2027 proposes on an MSME’s income from RM150,001 to RM600,000, RM160,000.

Set that against RM214,942 of interest on the ten-year ADF: at 24% the allowance is worth more than all of it, and at 16% about three-quarters, our arithmetic. PwC says unabsorbed allowances carry forward indefinitely, so a firm without profits keeps the deduction but sees no cash until it has tax to reduce.

The conditions to read before signing a purchase order:

  • At least 36 months in operation.
  • SIRIM verifies that the machine is more advanced than what the company uses and raises productivity, for a site-verification fee.
  • An external auditor certifies proof that the machine’s entire cost has been paid. The guideline does not say how hire purchase is treated.
  • Not claimable in the same year of assessment as reinvestment allowance.
  • On a machine bought partly with a government grant, only the part the grant did not cover counts.

Which route fits which firm?

The route depends on the size of the purchase and what the firm makes, with the tax allowance sitting on top of whichever loan it uses. Our wider SME financing sheet covers schemes not built for machines.

  • A Malaysian SME buying up to RM3 million of machinery: the ADF. BNM requires at least 51% Malaysian shares, and it excludes refinancing an existing loan.
  • A manufacturer or manufacturing-related service firm: ask about SAFP in the same week. We found no MIDF page with application steps, so ask MIDF directly.
  • Spending above RM3 million, or a bank that says its ADF is used up: a GGSM4 loan, or the Technology Adoption Fund from Bank Pembangunan Malaysia’s (BPMB) group, whose current rate the annex does not print.
  • A firm above the SME line: the ADF is closed to it. GGSM4 also covers mid-tier companies, up to RM30 million at 70% cover and a 1.0% fee.

A GGSM4 trap: SJPP excludes financing funded or subsidised by the government, or benefiting from other government incentives. Ask the bank in writing whether a tax allowance counts. The Budget annex also describes an SJPP scheme with capital spending terms of up to 12 years while the GGSM4 page says seven, so ask which applies to a loan drawn in 2027 (annex).

What should an owner do first?

An owner should stop looking for a grant to pay for this machine and open a financing and tax file on it this month, in the order below.

  1. Stop paying anyone to find a grant for this machine. If a vendor or consultant says one is open, ask for the MIDA page and check that it covers machines.
  2. Ask two banks for the ADF. BNM’s list of participating lenders, a file whose metadata dates it to October 2024, names 15 lenders, Maybank, Public Bank, CIMB and SME Bank among them. Ask whether allocation remains: the latest figure we found is The Star’s report of BNM’s deputy governor saying in June 2024 that one-third of RM1.5 billion had been taken up.
  3. Get the rate in writing, including the fee, with the share of the price the bank will fund and how long a decision takes.
  4. Ask MIDA about the Automation CA before you commit to a model, and take your tax agent’s view on timing. This one has a clock: spending up to year of assessment 2027.
  5. Put the payment in the cash flow as debt. At RM10,125 a month for 120 months, the machine has to free up that much in labour, scrap or extra margin. Test the vendor’s payback claim against that number.

Where each figure comes from

Every scheme term comes from the owner’s own page, listed under Sources, and each calculation is ours.

What we could not establish:

  • The ADF’s balance. BNM publishes none. Its ADF documents are undated except the FAQ, updated as at 18 October 2024. SJPP’s archive page lists its ADF guarantee scheme, a RM300 million tranche that ran from 6 March 2020, as fully utilised and closed, while BNM’s page still shows the facility as available until full utilisation. Ask the bank which applies.
  • Budget 2026’s automation money. Budget 2026 said development financial institutions would provide close to RM1 billion of financing and grants for automation, The Star reported on 10 October 2025. We found no application page or guideline for it.
  • A current copy of the closure notice. MIDA’s site no longer shows it and we found no live copy elsewhere, so it is quoted above without a link. We did not survey state schemes.
  • Base rates after July 2025. Maybank’s 6.40% is the last figure we could open.

This is not individual tax or financing advice. Errors can be reported through our corrections page.

Sources

  1. Bank Negara Malaysia, SME Automation and Digitalisation Facility factsheet
  2. Bank Negara Malaysia, ADF frequently asked questions, updated 18 October 2024
  3. Bank Negara Malaysia, ADF list of participating financial institutions
  4. Bank Negara Malaysia, Funds for SMEs
  5. The Star, BNM to revamp its fund for SMEs deployment, 13 June 2024
  6. Syarikat Jaminan Pembiayaan Perniagaan, Government Guarantee Scheme MADANI 2026
  7. Ministry of Finance, Budget 2027 speech and annex tables (in Malay, our translation)
  8. MIDA, e-SAG portal, closure notice for the Smart Automation Grant under PENJANA
  9. MIDA, Smart Automation Grant release, 2 December 2020
  10. MIDA, guideline for the MADANI Smart Automation Grant
  11. MIDA, Grants page
  12. MIDA, Domestic Investment Accelerator Fund (ESG Adoption) guideline, as of 19 October 2026
  13. MIDA, Industry4WRD Intervention Fund guideline, September 2023
  14. MIDA, Automation Capital Allowance guideline, as of 1 July 2024
  15. PwC Worldwide Tax Summaries, Malaysia, deductions, reviewed 16 June 2026
  16. PwC Worldwide Tax Summaries, Malaysia, taxes on corporate income, reviewed 16 June 2026
  17. The Star, report of the minister’s Dewan Rakyat reply, 26 November 2025
  18. Syarikat Jaminan Pembiayaan Perniagaan, ADF guarantee scheme, archive page
  19. The Star, Highlights from Budget 2026, 10 October 2025
  20. The Star, Maybank cuts base rate and BLR, 9 July 2025

Published by Malaysia Bisnes. See the masthead for who writes and who publishes this magazine.

See something wrong? Write to the editor through the corrections page. Corrections are noted on the article.

Hadi Rosman covers Malaysian economic data and business financing, working from Department of Statistics Malaysia and Bank Negara Malaysia releases.